"It really brings more personality to golf," Sara Bryant, general manager of Malbon, told The Pilot when the Los Angeles brand opened its store at 395 Magnolia Road this summer. The store has a putting green inside. Customers can try Malbon putters on it, and the brand built it to get shoppers talking with each other and with staff.
Malbon is one of several new things on Magnolia Road this fall. Farther along the same road, the new Given Memorial Library is under construction. The Village has also hired a contractor to lay brick sidewalks along Rattlesnake Trail and Magnolia Road to connect to it. Meanwhile, the Village's fall events still happen where they always have, around the Village Green and James W. Tufts Memorial Park. This season, a fall walk through the Village covers two places: the familiar center where the events are held, and a newer stretch of town where the next library, sidewalks and shops are being built.
Two New Shops, Both Aimed at Women in Golf
Malbon was founded in 2017 by Stephen and Erica Malbon, and the Pinehurst store is the brand's 10th in the United States. Each Malbon store usually carries a T-shirt and sweatshirt sold only at that location, and Bryant said Pinehurst-only merchandise is on the way. She added that limited items tend to sell out: "Usually, if you see something you want, you have to get it because it doesn't always last."
In The Pilot's coverage, the brand put its women's line front and center. "Women's golf has really grown in the last few years," Bryant said. "The women's side of fashion in golf is growing as well, and we have definitely made an impact in that."
A few blocks away, Marie Birdie has opened at 105 Market Square, inside the original Village Center. It's a woman-owned golf-wear brand for kids, tweens, teens and women, based in West Palm Beach. After running several pop-ups in the area, founder Rebekah Alfond picked Pinehurst for the brand's second store. She told The Pilot she spent more time in the area before opening the store. She started the company because she couldn't find stylish, high-performance golf clothes for girls. Sizes run from age 4 up to women's extra large, and every skirt, dress and pair of shorts has pockets.
The two shops keep different hours:
- Malbon, 395 Magnolia Road: 10 a.m. to 6 p.m. Monday through Saturday, noon to 5 p.m. Sunday
- Marie Birdie, 105 Market Square: 10 a.m. to 5 p.m. Wednesday through Saturday, 11 a.m. to 4 p.m. Sunday, closed Monday and Tuesday
Marie Birdie's closed days matter if you're planning an early-week errand. For anyone walking between the two stores, Magnolia Road is also where most of the Village's construction is happening.
What's Taking Shape on Magnolia Road
The new Given Memorial Library is a 9,250-square-foot building designed by Oakley Collier Architects and built along Magnolia Road. In September 2025, the Village Council gave the $4.5 million construction contract to M-Squared Construction, the lowest of seven bidders. The contract calls for substantial completion within 365 days of the start of work, which the Village says could mean March 2027.
The library's history goes back to 1964, when Sarah Given Larson paid for the original building and Richard S. Tufts gave the land. The Tufts Archives was added about a decade later. The new building is the first big change to that arrangement in roughly 60 years.
At the September 8 council meeting, the Village said the contractor had finished the building pad, underground utilities, reinforcing steel and concrete slab over the prior 30 days, and the site drainage was about 95% complete. The next month's work was the front and rear patio footings, the start of metal framing and the beams for the storefront window systems. So the building should be rising out of its slab during the weeks of Holly Fest and Oktoberfest.
The sidewalks are planned to come next. On June 9, the council gave Sanford Contractors an $824,650 contract for sidewalk and stormwater work along Rattlesnake Trail. The work will link to the new library and nearby development and send stormwater to the pond behind the Police Department. The bid notice describes about 1,200 linear feet of five-foot brick sidewalk, 200 feet of concrete box culvert and 600 feet of 24-inch storm-drain pipe along Rattlesnake Trail and Magnolia Road. In June, the Village expected work to start in late summer and finish around Thanksgiving. That was a June forecast rather than a confirmed schedule, so treat the Thanksgiving finish as a target. At the same meeting, staff were directed to ask Duke Energy for a cost estimate to bury the overhead power lines between NC 211 and McCaskill Road.
Once the library moves, the current Given Memorial building will be renovated for the Tufts Archives. On September 8, the council reviewed the archives renovation plan. The architect's estimate is about $4.1 million, and the Village has budgeted $2.5 million. The council agreed to keep designing and take the project to bid before deciding whether to scale it back or find more money. The Village noted that private donations could help close the gap. That means two library buildings are in progress at once: the new one going up on Magnolia Road, and the old one waiting for its renovation budget.
The Fall Events Still Happen Around Tufts Park
None of this changes where the fall events are held. Almost every Village event this fall is at Tufts Memorial Park, the Village Green, Cannon Park or the Village Arboretum. The two holiday events from Sandhills Community College are at its Horticultural Gardens.
| Date | Event | Where | Details |
|---|---|---|---|
| Through Nov. 1 | Sandhills Scarecrow Stroll | Sandhills Horticultural Gardens | Free, 8 a.m. to 5 p.m. daily |
| Sat., Oct. 17 | Holly Arts & Crafts Festival | Village Center | 10 a.m. to 4 p.m., 200+ crafters, new PineyFest kids' market in Tufts Memorial Park |
| Sat., Oct. 24 | Scarecrow Fest: Costume Day & Native Plant Sale | Sandhills Horticultural Gardens | 10 a.m. to 2 p.m. |
| Sat., Oct. 24 | Oktoberfest | James W. Tufts Memorial Park | Kinderfest 4 to 6 p.m., German music 6 to 9 p.m. |
| Fri., Oct. 30 | Hocus Pocus on the Village Green | James W. Tufts Memorial Park | Free, 7 p.m. |
| Sat., Oct. 31 | Monster Mash Dash | Cannon Park | Fun run 8:30 a.m., 5K 9 a.m., benefits Special Olympics Moore County |
| Sat., Nov. 21 | Turkey Trot | Starts at the Village Arboretum | Route through Village streets and neighborhoods |
| Nov. 23 to 28 | Shop Small This Season | Village businesses | Eligible purchases enter a gift-basket drawing; Small Business Saturday is Nov. 28 |
| Nov. 27 to Jan. 9 | Sandhills Garden of Lights, first year | 3245 Airport Road | Wednesdays to Sundays, 5 to 10 p.m. |
| Fri., Dec. 4 | Christmas Tree Lighting | James W. Tufts Memorial Park | 5 to 7:30 p.m., lighting at 6:30 p.m. |
October 24 is the busiest day. Scarecrow Fest ends at the Horticultural Gardens at 2 p.m., and Kinderfest starts at Tufts Memorial Park at 4 p.m., so a family can do both with time to spare.
Holly Fest has the most changes this year. Pinehurst Parks & Recreation sponsors it, and the Pinehurst Business Partners present it. Downtown shops run sales and specials alongside more than 200 crafters. New this year is PineyFest, a marketplace created and run by kids, set up in Tufts Memorial Park. It's also the first Holly Fest since both new golf shops opened. Marie Birdie's Market Square storefront is inside the festival area. Malbon on Magnolia Road is a short walk farther out.
The Sandhills Garden of Lights is new for the holidays. It runs five nights a week from November 27 through January 9 and will have hot chocolate, other drinks and photo spots. Tickets weren't on sale yet when we wrote this. The college's event roundup lists the last night as January 10, while the event's own page says January 9, so check the closing date before planning a visit late in the run.
Parking, Shuttles and the Three-Hour Limit
More places to go in the Village means more people parking there. For Holly Fest, the Village lists two public gravel lots, at 1 Village Green Road West by Tufts Park and at 50 Dogwood Road. There's also a free shuttle from Rassie Wicker Park at 10 Rassie Wicker Drive. With more than 200 crafters and shops running specials, the shuttle avoids hunting for a space on Market Square.
The three-hour parking limit in the Village Center is also being enforced more consistently now. Through July 2, the Village had issued 75 citations. Sixty-six were warnings and nine were $50 tickets. The Village says starting with warnings seems to have made short-term spaces easier to find. A Saturday that includes shopping at Marie Birdie, lunch in the Village Center and an afternoon of crafts can easily go past three hours. The Rassie Wicker shuttle avoids the limit altogether.
The other big Village road project won't affect this season. On September 22, the council revised its request asking the N.C. Department of Transportation to study a "Turbo Hybrid" design for the Traffic Circle with updated traffic projections. The Village points out that NCDOT controls the Circle and decides its final design and schedule. Construction there is expected sometime between the 2029 and 2035 U.S. Open Championships, so it won't touch this year's fall events.
The council's Village priorities line up with what's being built on Magnolia Road. In the 2026 community survey, which 812 residents answered, sidewalks, intersection improvements and stormwater upgrades ranked as the top capital priorities. The Rattlesnake Trail contract covers sidewalks and stormwater on the stretch where the new library is going up.
At BHGRE Lifestyle Property Partners, we follow changes like these on Magnolia Road and around the Village Center throughout the year, from library framing to new storefronts on Market Square. If you'd like to talk about how these changes connect to the part of Pinehurst you call home, our team is glad to help you Find Your Lifestyle.
This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.